Aqua v parku Kyjov

Project category ‐ New building

Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo
Author Václav Navrátil, Jan Sedláček
Studio SENAA architekti, s.r.o.
Location Mezivodí 2029, 697 01 Kyjov
Investor Město Kyjov
Supplier Sdružení Metrostav a.s. a Metrostav DIZ s.r.o.
Date of completion / approval of the project September 2023
Fotograf BoysPlayNice

The Aquapark Sport and Relaxation Center began with a modernization of the outdoor public swimming pool and now has a newly built indoor swimming pool to complement it. The pool history started early in the 20th century with the establishment of the river swimming spa. The complex is sensitively set in the interface between the existing urban structure and central Kyjov Park; it is surrounded by 100-year-old trees. Because of a new operating arrangement, the existing area receives maximum use. With proximity to the park and city center, clients can discover an attractive sporting and relaxation experience.
The new building complements the surrounding environment and does not disturb its overall character. The linear arrangement and fine structure of the new building extend along Mezivodí Street and terminate at the street’s endpoint. The new forecourt of the pool is located on the main pedestrian and cycling route leading to the city center. As part of its revitalization, an alley of trees was rejuvenated, paved areas were modified and urban structures were added. Pool visitors and passers-by can enter at any time and enjoy a cup of coffee on one of the outdoor terraces accessible from the lobby.
The facade is softened by lining it with brick strips and gold-colored perforated sheet metal. All this is supported by views through the building, which visually connect the area of the outdoor swimming pool with the forecourt of the pool. The indoor pool chamber is turned about the building by ninety degrees and runs into the outdoor greenery. The full-surface glazing of the pool chamber enhances the feeling of connecting the indoor and outdoor spaces. The architectural proposal envisions a gradual increase in the pool's construction over the next 10 years.

The indoor pool chamber is divided into three main parts – swimming pool, adventure pool, and wellness. The main swimming pool has five lanes with a length of 25 m. The pool experience features benches with massage jets, pool spouts, and a water slide. There is also a whirlpool, and even the little ones will have fun in the children's wading pool. While in the pool, visitors enjoy pleasant views of the adjacent park and the greenery of the outdoor complex.
There are five saunas in the wellness area - tropical, salt, aroma, Turkish steam bath, and Finnish ceremonial sauna with a view of the outdoor pool. All saunas are of different sizes and temperatures and are constructed to create a feeling of intimacy.

The foundation is made on drilled piles with a diameter of 600 mm. Due to the high level of groundwater, the substructure is a monolithic white tub made of Permacrete waterproofing concrete. The above-ground part is made of a prefabricated reinforced concrete frame with linings. The pool hall is covered with CLT panels with mineral wool thermal insulation. The perimeter walls of the ground floor are insulated with contact facade EPS with brick strips. The second floor has a ventilated facade with a gold-colored profiled sheet. There is a PV plant and extensive greenery on the flat ridges.
The summer and indoor pool tubs are made of stainless steel.

Green building

Environmental certification

Type and level of certificate -

Water management

Is rainwater used for irrigation?
Is rainwater used for other purposes, e.g. toilet flushing ?
Does the building have a green roof / facade ?
Is reclaimed waste water used, e.g. from showers and sinks ?

The quality of the indoor environment

Is clean air supply automated ?
Is comfortable temperature during summer and winter automated?
Is natural lighting guaranteed in all living areas?
Is artificial lighting automated?
Is acoustic comfort, specifically reverberation time, guaranteed?
Does the layout solution include zoning and ergonomics elements?

Principles of circular economics

Does the project use recycled materials?
Does the project use recyclable materials?
Are materials with a documented Environmental Product Declaration (EPD) promoted in the project?
Are other sustainability certifications used for materials and elements?

Energy efficiency

Energy performance class of the building according to the Energy Performance Certificate of the building A
Is efficient energy management (measurement and regular analysis of consumption data) considered?
Are renewable sources of energy used, e.g. solar system, photovoltaics?

Interconnection with surroundings

Does the project enable the easy use of public transport?
Does the project support the use of alternative modes of transport, e.g cycling, walking etc. ?
Is there access to recreational natural areas, e.g. parks, in the immediate vicinity of the building?