Fotbalové kabiny

Project category ‐ New building

Project photo Project photo Project photo Project photo Project photo Project photo
Author 3K Architects
Studio
Location Sobíňov
Investor TJ Sokol Sobíňov
Supplier STAVITELSTVÍ KAFKA s.r.o.
Date of completion / approval of the project July 2021
Fotograf

New football facilities are built on the site of the original football facilities that had to be pulled down due to bad technical conditions. They are designed as a two-storey building. The sun coming from only one side offered very interesting mass solution.

The football facilities are built on the concrete slab. Vertical load-bearing and non-bearing structures are built of bricks. Horizontal load-bearing structures are made of joists and cylinders. The roof is made of roof glued beams. Facade is made of plaster and wooden vertical boards.

Green building

Environmental certification

Type and level of certificate -

Water management

Is rainwater used for irrigation?
Is rainwater used for other purposes, e.g. toilet flushing ?
Does the building have a green roof / facade ?
Is reclaimed waste water used, e.g. from showers and sinks ?

The quality of the indoor environment

Is clean air supply automated ?
Is comfortable temperature during summer and winter automated?
Is natural lighting guaranteed in all living areas?
Is artificial lighting automated?
Is acoustic comfort, specifically reverberation time, guaranteed?
Does the layout solution include zoning and ergonomics elements?

Principles of circular economics

Does the project use recycled materials?
Does the project use recyclable materials?
Are materials with a documented Environmental Product Declaration (EPD) promoted in the project?
Are other sustainability certifications used for materials and elements?

Energy efficiency

Energy performance class of the building according to the Energy Performance Certificate of the building B
Is efficient energy management (measurement and regular analysis of consumption data) considered?
Are renewable sources of energy used, e.g. solar system, photovoltaics?

Interconnection with surroundings

Does the project enable the easy use of public transport?
Does the project support the use of alternative modes of transport, e.g cycling, walking etc. ?
Is there access to recreational natural areas, e.g. parks, in the immediate vicinity of the building?