| Author |
Jiří Řezák, Ing. arch. Tomáš Němec, Ing. Jan Zmátlík, Ing. arch. Blanka Drašnarová, Ing. arch. David Wittassek |
| Studio |
Qarta Architektura a.s. |
| Location |
Stanice metra Českomoravská (mezi ulicemi Drahobejlova a Ocelářská) |
| Collaborating professions |
METROPROJEKT Praha a.s. |
| Investor |
Kaprain a.s., Crescon a.s. |
| Supplier |
HOCHTIEF CZ a. s., SYNER s.r.o. |
| Date of completion / approval of the project |
March 2026 |
| Fotograf |
Boys play nice |
The Českomoravská Station redevelopment project is the first phase of a comprehensive urban transformation of the entire surrounding area, which, according to the architects’ design, builds on the historical character of this part of Prague. The site has long been characterized by fragmented development—a remnant of the original block, gradual insensitive interventions over the decades, and heavy traffic associated with the bus terminal.
The goal was not merely to address a single building, but to view the site within a broader historical and urban context. Českomoravská has always been an atypical city block, and the aim was to restore this character while respecting the site’s current needs.
The metro station is thus the first phase of the future development of the entire block. The result will be a compact urban complex with office buildings, public space, and a plaza in front of the O2 Arena, complemented by walk-through arcades with shops that will make this urban area more pleasant for pedestrians and encourage their natural movement through the site.
The original station was highly fragmented in both layout and architecture and did not appear as a cohesive whole. We undertook a radical streamlining and simplification of the space—both in terms of materials and form. Concrete and glass became the dominant materials, giving the station a contemporary, timeless expression in a minimalist spirit.
The renovation ended up being significantly more extensive than originally planned. Due to the poor quality of the original concrete structures and materials, it was ultimately necessary to replace them with new ones to a large extent.
The station includes retail spaces, public restrooms, and passenger facilities. The next phase of the project also includes plans to expand barrier-free access, which will further improve the station’s comfort and accessibility. The above-ground section of the station will also house new DPP offices.
Another significant feature is the new infographics by the Prague Public Transport Company, which are sensitively integrated into the minimalist architectural concept and enhance spatial orientation.
The renovation of the Českomoravská metro station involved a comprehensive modernization of the building structures, public spaces, and the station’s technical facilities. As part of the project, unsuitable and unused vestibule extensions were removed, the layout of the above-ground section was redesigned, and new architectural cladding was installed, combining glass-fiber-reinforced plastic walls and large-format glass-fiber-reinforced concrete facade elements. The construction work also included a complete renovation of the public restrooms, including barrier-free access from street level. The project further involved coordination with the planned real estate development in the vicinity of the station.
Green building
Environmental certification
| Type and level of certificate |
-
|
Water management
| Is rainwater used for irrigation? |
|
| Is rainwater used for other purposes, e.g. toilet flushing ? |
|
| Does the building have a green roof / facade ? |
|
| Is reclaimed waste water used, e.g. from showers and sinks ? |
|
The quality of the indoor environment
| Is clean air supply automated ? |
|
| Is comfortable temperature during summer and winter automated? |
|
| Is natural lighting guaranteed in all living areas? |
|
| Is artificial lighting automated? |
|
| Is acoustic comfort, specifically reverberation time, guaranteed? |
|
| Does the layout solution include zoning and ergonomics elements? |
|
Principles of circular economics
| Does the project use recycled materials? |
|
| Does the project use recyclable materials? |
|
| Are materials with a documented Environmental Product Declaration (EPD) promoted in the project? |
|
| Are other sustainability certifications used for materials and elements? |
|
Energy efficiency
| Energy performance class of the building according to the Energy Performance Certificate of the building |
|
| Is efficient energy management (measurement and regular analysis of consumption data) considered? |
|
| Are renewable sources of energy used, e.g. solar system, photovoltaics? |
|
Interconnection with surroundings
| Does the project enable the easy use of public transport? |
|
| Does the project support the use of alternative modes of transport, e.g cycling, walking etc. ? |
|
| Is there access to recreational natural areas, e.g. parks, in the immediate vicinity of the building? |
|