63.

Památník zmizelých - památník transportů z 5. nástupiště brněnského nádraží

Project category ‐ Architectural design, small scale architecture and creative work in architecture

Project photo Project photo Project photo Project photo Project photo Project photo Project photo
Author doc. Ing. arch. Tomáš Rusín
Studio Atelier RAW s.r.o.
Location Nádražní ulice, 5. nástupiště brněnského hlavního nádraží
Investor Židovská obec Brno, Statutární město Brno
Supplier akad. soch. Jiří Plieštik
Date of completion / approval of the project August 2023
Fotograf Bořivoj Čapák

In memory of the 10,080 Jewish citizens of Brno and surrounding villages deported to their deaths from this station during the Nazi occupation.


The memorial should be a splinter in the palm of your hand.
You don't know about it, and when you bump into it, it hurts.

On 16 November 1941, the first transport of the Jewish inhabitants of Brno and the surrounding villages, named "F", was dispatched from Platform 5 of the Brno main station to the ghetto in Minsk. The unveiling of the Memorial to the Disappeared was initiated by the Jewish Community of Brno to commemorate the eighty-second anniversary of the transports of the Jewish inhabitants of Brno and the surrounding communities to the concentration and extermination camps.

Green building

Environmental certification

Type and level of certificate -

Water management

Is rainwater used for irrigation?
Is rainwater used for other purposes, e.g. toilet flushing ?
Does the building have a green roof / facade ?
Is reclaimed waste water used, e.g. from showers and sinks ?

The quality of the indoor environment

Is clean air supply automated ?
Is comfortable temperature during summer and winter automated?
Is natural lighting guaranteed in all living areas?
Is artificial lighting automated?
Is acoustic comfort, specifically reverberation time, guaranteed?
Does the layout solution include zoning and ergonomics elements?

Principles of circular economics

Does the project use recycled materials?
Does the project use recyclable materials?
Are materials with a documented Environmental Product Declaration (EPD) promoted in the project?
Are other sustainability certifications used for materials and elements?

Energy efficiency

Energy performance class of the building according to the Energy Performance Certificate of the building
Is efficient energy management (measurement and regular analysis of consumption data) considered?
Are renewable sources of energy used, e.g. solar system, photovoltaics?

Interconnection with surroundings

Does the project enable the easy use of public transport?
Does the project support the use of alternative modes of transport, e.g cycling, walking etc. ?
Is there access to recreational natural areas, e.g. parks, in the immediate vicinity of the building?