232.

Sochařský atelier Řevnice

Project category ‐ New building

Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo Project photo
Author Svatopluk Sládeček, Jaroslav Matoušek
Studio Studio New Work
Location Řevnice
Investor soukromý
Supplier Vytastav Praha s.r.o.
Date of completion / approval of the project March 2023
Fotograf Petr Šmídek

The sculpture studio in Řevnice fills a gap in the existing development of family homes from the first half of the 20th century. It is a simple, single-storey building on the edge of the plot, connected to the family home by a covered entrance.

The art studio has a raised space thanks to a gable roof that follows the slope of the existing house. The other service areas are smaller in height. The roof forms a skylight, which provides the studio with indirect overhead lighting.

The building is made of brick blocks with ceramic-concrete ceilings and a wooden roof, with a fine-grained white plaster and white plastic windows. The floor is made of concrete. The sliding gates and doors are made of galvanized steel."

Green building

Environmental certification

Type and level of certificate -

Water management

Is rainwater used for irrigation?
Is rainwater used for other purposes, e.g. toilet flushing ?
Does the building have a green roof / facade ?
Is reclaimed waste water used, e.g. from showers and sinks ?

The quality of the indoor environment

Is clean air supply automated ?
Is comfortable temperature during summer and winter automated?
Is natural lighting guaranteed in all living areas?
Is artificial lighting automated?
Is acoustic comfort, specifically reverberation time, guaranteed?
Does the layout solution include zoning and ergonomics elements?

Principles of circular economics

Does the project use recycled materials?
Does the project use recyclable materials?
Are materials with a documented Environmental Product Declaration (EPD) promoted in the project?
Are other sustainability certifications used for materials and elements?

Energy efficiency

Energy performance class of the building according to the Energy Performance Certificate of the building C
Is efficient energy management (measurement and regular analysis of consumption data) considered?
Are renewable sources of energy used, e.g. solar system, photovoltaics?

Interconnection with surroundings

Does the project enable the easy use of public transport?
Does the project support the use of alternative modes of transport, e.g cycling, walking etc. ?
Is there access to recreational natural areas, e.g. parks, in the immediate vicinity of the building?